Demonstration example — fictional customer and quotation
Example customer information
Kitchen & Laundry Renovation — $48,000 Quote
Example BA-000032 · Quote Review · NZ$175 review tier
Quote Review · Emma Mitchell
Your submitted information
About the quote you want reviewed
Your answers
- What would you like to understand about this quote?
- I've received a quote for $48,000 to renovate my kitchen and laundry. Before accepting it, I want to understand exactly what is included and whether anything important has been left out. I'm also concerned about the allowances and the possibility of additional charges once construction starts. Can you review the quotation and advise what I should clarify with the builder?
- Briefly, what work is the quote for?
- Renovating the existing kitchen and laundry in our single-storey home built in the late 1980s. The work involves removing the existing kitchen and laundry fittings, installing new cabinetry and a benchtop, plumbing and electrical alterations, new vinyl flooring, a tiled splashback, plastering and painting. We also discussed moving the kitchen sink approximately 600 mm along the existing wall.
- Are you comparing this with other quotes?
- No. This is the first quotation we have received. The builder was recommended to us, but we want an independent review before committing to the work.
- Anything in particular that concerns you?
- I'm concerned about whether moving the kitchen sink is included, whether the $3,000 benchtop allowance will be sufficient, and what happens if concealed damage is discovered during demolition. We haven't received the final cabinetry drawings, and I'm not sure whether the electrical work includes everything we discussed. I'd also like to understand what costs are excluded and how additional work would be approved and charged.
Property / project address
123 Example Street, Example Suburb, Auckland, 1010
Fictional quotation
Build_Advice_Fictional_Renovation_Quote_NZ48000.pdf · 2 pages
Static quotation details — demonstration example, not a downloadable PDF.
- Site establishment / protection / waste
- NZ$2,200
- Strip-out
- NZ$3,400
- Carpentry / make-good
- NZ$7,600
- Cabinetry including benchtop
- NZ$14,500
- Plumbing
- NZ$4,300
- Electrical
- NZ$3,400
- Wall linings / plaster
- NZ$3,100
- Vinyl plank flooring — approximately 21 m²
- NZ$3,000
- Painting / finishing
- NZ$2,500
- Concealed wall / floor repairs — provisional sum
- NZ$2,000
- Tiled splashback including tile allowance
- NZ$2,000
- Total including GST
- NZ$48,000
Allowances included in the total
- PC allowance within total: benchtop supply NZ$3,000.
- PC allowance within total: splashback tiles supply NZ$1,200.
- PS allowance within total: concealed works NZ$2,000.
Assumptions
Existing service locations retained.
Exclusions
- Appliances
- Design / engineering
- Council consent fees
- Structural work
- Asbestos testing / removal
- Concealed repairs exceeding the allowance
- Repairs outside the stated rooms
Timing
Start 4–6 weeks after acceptance; approximate four-week build.
Payments
30% on acceptance, 40% on commencement, 30% on practical completion.